A modified hot-water jet-wash is used with a steel rod and nozzle to drill to the bottom of the glacier in around 20-30 minutes. More details about the drilling can be found in the 2003 field trip pages, as this was the first time it was used.
A modified hot-water jet-wash is used with a steel rod and nozzle to drill to the bottom of the glacier in around 20-30 minutes. More details about the drilling can be found in the 2003 field trip pages, as this was the first time it was used.